
This workshop on Sept. 30th, 2019 in Cyprus will provide cutting edge insights and extensive technical information in the area of next-generation PV performance monitoring systems that leverage machine learning and data analytics to ensure improved reliability and optimized levelised cost of electricity (LCoE).
Participants will get in-field knowledge of PV monitoring and high quality data-acquisition, leveraging machine learning for energy analytics and latest technology developments to quantify performance losses and optimize the LCoE though cost-effective automated reactive and proactive O&M. The workshop is intended for Project developers and EPCs, O&M service providers, Investors, Consultants and Researchers in the renewable energy sector.
For more details and information visit our IPERMON Project page.
More articles
How strong are you? 💪🏼
Such was the question asked by electronics apprentice Fabio Rudigier when determining a suitable topic for his final project as part of his final apprenticeship examination. He wanted to develop a machine that measures the force applied by an arm press and displays it visually on a display device.
Read more...Introducing GI.bench – Enhanced DAQ Capabilities for Engineering Excellence
Engineers and technicians often have a lot of problems when they are dealing with complicated data acquisition setups. These setups can include large amounts of data, the use of different devices, and the need for information in real time. Addressing these challenges head-on, Gantner Instruments proudly announces the latest evolution of our industry-leading software, GI.bench.
Read more...Wünderla ko
“Wünderla ko" on September 16, 2023 from 10 am - 4 pm along Montafonerstrasse 4-21 in Schruns.
Read more...Force monitoring improves efficiency of Airbus’ Final Assembly Line
In November 2016 the Airbus A350-1000 flew for the very first time. The A350-1000 is part of the A350 XWB family and is Airbus’ largest and most powerful twin-engined airliner ever. Airbus began the assembly of the A350-1000 in September, 2015, less than a year after the first delivery of the A350-900. For maximum flexibility, the existing A350 XWB Final Assembly Line (FAL) can be used for both A350-900 and A350-1000 models.
Read more...