Austria | Germany | France | Sweden | India | USA | China | Singapore
PV & Grid Integration Symposium
News | 2 minutes Reading Time |

PV & Grid Integration Symposium

Meet us at the 2019 PV Systems Symposium, the leading industry get together for PV Monitoring and grid integration in Albuquerque (New Mexico), United States.

Advanced PV Performance Analysis on Modules and Power Plants using Cloud-Based Processing

Real world asset performance matters for technology selection and your investment. In his presentation on May 15th, Juergen Sutterlueti will share the latest updates about PV performance analytics on both modules and power plants using cloud based real time processing. Learn how efficient data processing and management with the GI.cloud can help O&M providers, asset owners and banks provide databases with multiple arrays and decades of data.

With its advanced normalized and multi-level model we can monitor and control data streams from different energy generation sources, like PV, hydro, balancing components such as battery energy storage, and consumption in real time (up to 100 measurements/second).

What you will learn in a nutshell

  • Real time monitoring with GI.cloud and edge computing devices
  • Best in class performance models and prediction with live demonstration
  • Benchmarking of available PV models: mechanistic, machine learning and recommendations from latest IEC 61853.1-4

Find out more about Ganter Instruments’ accurate and fast PV measurements using a scalable, distributed cloud backend. It enables an easy understanding of performance for optimization, loss analysis and fault finding using advanced mechanistic models and machine learning techniques.

PV Grid
Outdoor Test Facility

Contact for appointments

Juergen Sutterlueti | j.sutterlueti [at] www.gantner-instruments.com

Get your personal demonstration with our experts here!

Event

PV & Grid Integration Symposium
Albuquerque, New Mexico
May 14 ‑ 16, 2019

Presentation time: May 15th, 10:40 AM

Request GI.cloud Demo

More articles

News

End-of-Line Testing of Preh’s Battery Management Systems

End-of-line testing for high-voltage Battery Management Systems (BMS) is critical to ensuring performance, safety, and longevity, both for the systems themselves and the vehicles they power. As battery technologies advance, BMS testing grows increasingly complex. Discover how Preh uses Gantner Instruments' high-voltage data acquisition technology for end-of-line testing, specifically designed to meet the demands of e-mobility.

Read more...
News

Force monitoring improves efficiency of Airbus’ Final Assembly Line

In November 2016 the Airbus A350-1000 flew for the very first time. The A350-1000 is part of the A350 XWB family and is Airbus’ largest and most powerful twin-engined airliner ever. Airbus began the assembly of the A350-1000 in September, 2015, less than a year after the first delivery of the A350-900. For maximum flexibility, the existing A350 XWB Final Assembly Line (FAL) can be used for both A350-900 and A350-1000 models.

Read more...
Products & Services

Precision Quiescent-Current Measurement with Q.raxx X slimline A108 2SC

Quiescent current measurement is essential across various industries, notably in the development of battery-powered devices, automotive electronics, and energy-efficient technologies. Also known as standby current, this crucial parameter measures the current in electronic systems during idle states, significantly impacting power consumption, battery longevity, and overall efficiency. Minor inaccuracies in its measurement can lead to considerable consequences.

Read more...
News

Boeing 777X folding wingtip

Boeing is looking to debut a new and ambitious aircraft in 2020: the 777X, a dual-aisle, twin-engine aircraft that is built around fuel efficiency. The aircraft is designed to use 12% less fuel than any competing aircraft and 20% less fuel than today’s 777.

Read more...