Together with Gantners partner Moore Industries focused subjects were prepared to meet the needs regarding solutions and products. Especially the fatigue monitoring of power plant steam pipes were deeply discussed. Further subjects were strain measurement in concrete (vibrating wire) and the Smart Device Integrity Test Station SDITS.
The “Lunch and Learn” provides 3 interesting hours of great conversation for EDF, Gantner Instruments and Moore Industries. Thank you EDF.


More articles
High Performance Measuring Module D107 for Frequencies
The Q.bloxx D107 is a new measurement module for the acquisition of frequencies and incremental signals. Due to its fast signal conditioning capability with a clock speed of 288 MHz, the new module is suitable for extreme measurement of rotational speeds, which were not previously possible in this price range.
Read more...Huge Wind Turbine Blade Tests at BLAEST
The world’s longest rotor blade was manufactured by LM Wind Power in Denmark. Planning the test of the 290 ft (88.4 m) long rotor blade began in 2015. With BLAEST (the Blade Test Centre) Tests are now underway together in Aalborg, Denmark.
Read more...Turn your TwinCAT automation system into a high-performance Data Acquisition System
Connectivity and flexible integration of our high-accuracy and high-speed I/O modules into any automation system is in our DNA. That is why we have made our high-performance Q.series X I/O modules available for easy and comfortable integration into TwinCAT, the EtherCAT master from Beckhoff.
Read more...6 Tips for Stress-free Strain Measurement during Fatigue Testing of Aircraft Structures
Strain is the single most important measurement during aircraft fatigue testing. The accuracy and precision of strain gauge measurements is of the greatest importance to exactly determine the durability and damage tolerance of a structure. The higher a structure is in the ‘pyramid of test’, the higher the test complexity, number of measurement channels, and data produced. On top of that the risk in terms of time delay and cost associated to a test program increases more than proportional with the increase in test complexity. Here are six tips to help you choose the right data acquisition system for your fatigue test:
Read more...