As the size of wind turbines whose blades will soon exceed the 100 m mark and generate power of up to 8 MW, the question of the material (composites) and its strength is an ongoing issue. The Danish Test Center BLAEST in Aalborg has specialized in the testing of components of wind turbines.
The test center BLAEST, owned by the leading wind technology institutes Force Technology, Technical University of Denmark (DTU – Risø) and Det Norske Veritas DNV Germanischer Lloyd – GL operates several test stands for strength and fatigue testing of rotor blades.
The prototype of each rotor blade has to be tested before approval, and series production on its strength. These tests are carried out in accordance with IEC 61400-23. BLAEST is certified for the complete test.


Read on this topic, our cover story in the issue 03/2016 of the journal mpa here!
More articles
Science Brunch – IPERMON
On the 8th of October the climate and energy fund invites Gantner Instruments Vice President Jürgen Sutterlüti to present the project IPERMON at the science brunch in Vienna.
Read more...Strain Measurements on Flexible Pipeline Systems
NOV in Denmark tests flexible pipeline systems with the Gantner Instruments Q.bloxx modules.
Read more...Symposium on International Automotive Technology
The Symposium on International Automotive Technology (SIAT 2026) returns to Pune from January 28–30, bringing together engineers, researchers, and technical leaders shaping the future of safe, sustainable mobility.
Read more...International Trade Fair for Electronics Development and Production
Your path to electronic excellence begins at Productronica India 2023. With Gantner Instruments at your side, you are well-equipped to seize opportunities and conquer challenges in the electronic industry. We look forward to meeting you at Productronica India 2023!
Read more...