Overview
The new trains in Singapore are part of Land Transport Authorithy`s efforts to enhance existing rail capacity for the coming years. Out of the 42 trains, 18 trains are aimed at the North East Line (NEL) of the network while the Circle Line (CCL) will receive the 24 trains. This will improve fleet capacity by 60-70% on both lines.

The Gantner Solution
Once train cars shipped to Singapore they carrry out testing before they put them in to operation.
Test Measurement and Control system from Gantner Instruments equipped with multi-channel analog input modules and Dynamic High Voltage input modules with high isolations for Train testing for the complete driverless metro system designed and constructed by Alstom which are operating on NEL (North East Line) and CCL (Circle Line) Railway lines. The Alstom Metropolis C830 are the second generation of communication-based train control (CBTC) rolling stock currently using in Mass Rapid Transit (MRT) lines to meet the growing demand of passengers in Singapore.

NEL (North East Line) project
1 x Q.brixx station
1 x Q.brixx A101
2 x Q.brixx A107
2 x Q.brixx A128

CCL (Circle Line) project
1 x Q.brixx station
1 x Q.brixx A107
1 x Q.brixx A128
Q.brixx station

The powerful Q.brixx station is a programable test controller with logger functions.
Q.brixx A101

The Q.brixx module A101 with two universal inputs was selected for vibration measurement to provide fast high accuracy digitalization.
Q.brixx A107

The high density Q.brixx module A107 was selected to provide precise, isolated, noise free strain gage measurements.
Q.brixx A128

The Q.brixx module A128 with 4 galvanically isolated input channels was selected for high voltage testing.
More information about our products can be found in the product finder:
More articles
Wendelstein 7-X Stellarator
After 9 years in construction, the stellarator (nuclear-fusion machine) of the Max Planck Institute in Greifswald generated plasma for the first time on December 10, 2015. The reactor had been gradually ramped up over the past 12 months. The event was given extensive coverage in the media. Gantner Instruments specially developed sensors for temperature and strain measurement for the project, which are otherwise unavailable on the market.
Read more...Bridge Monitoring: The Cornerstone of Tomorrow’s Sustainable Infrastructure
A modern infrastructure enables us to organize mobility more sustainably, transport goods and commodities in a climate-friendly way and take advantage of the opportunities offered by digitization. Doing without it is not an option.
Read more...Project State Overview – Real-time Visibility and Control with GI.bench
Engineers managing complex test setups know the frustration of hunting through countless data files, sensor channels, and historical records. The new Measurement Explorer in GI.bench addresses this challenge head-on, streamlining data management into a unified, intuitive, and fast user interface.
Read more...GI.service Asset performance optimizer
With the significant investments being made in distributed renewable energies, the global energy market is changing from a central supply concept to a decentralized system. This transition is presenting companies in the energy market with various strategic and technical challenges to achieve efficient operations.
Read more...