The Gantner Instruments DAQ system is designed to receive signals from the test stand’s sensors and send reports back to the operator for monitoring and control. The Q.station controller is being programmed to automatically respond to errors and actuate fire safety valves to prevent System failures.
Construction recently began on the test stand by the SEDS software and electronics team. Gantner Instruments Technical Support team provided training on the use of the hardware and software and help with the initial configuration of the test stand DAQ system.
We will post more updates as construction continues on the Colossus project!
More information about the project can be found here:
More articles
Experience Innovation at The Aerospace Test and Development Show 2023
Join us from 19-20 September 2023 in Toulouse at The Aerospace Test and Development Show 2023 at booth 332. Register here for Your free exhibition pass.
Read more...SPS Smart Production Solutions Germany 2023
Join Gantner Instruments at SPS Smart Production Solutions Germany 2023 in Nurnberg from Nov 14-16, 2023, at Hall 5, Booth 436, Messe Nuremberg, and discover Gantner Instruments' latest innovations and solutions in test and measurement technology. SPS Smart Production Solutions Germany 2023 is one of the leading international trade fairs for smart and digital automation.
Read more...High-Accuracy, EHV Battery Temperature Measurement DAQ: GM Application Note
Gantner Universal Test & Measurement DAQ Systems with Precise Temperature Measurement, Distributed I/O, and Signal Conditioning, Selected for GM (Chevy Volt) Battery Testing.
Read more...33nd Dresden Bridge Building Symposium 2024
We are thrilled to announce the 33nd Dresden Bridge Construction Symposium (DBBS), set to take place on March 13th/14th, 2024
Read more...