Austria | Germany | France | Sweden | India | USA | China | Singapore
Designing SHM as Long-Term Measurement Infrastructure
Events | 5 minutes Reading Time |

Designing SHM as Long-Term Measurement Infrastructure

Across the United States, bridges, tunnels, dams, and large industrial structures are being pushed beyond their original design life and asked to carry higher traffic volumes, heavier freight, and more frequent extreme events. At the same time, the U.S. regulatory and asset-management environment still depends heavily on periodic inspection programs and documented condition data.

That combination is one reason SHM is moving from “interesting pilot” to “must-have measurement infrastructure” in 2026: owners and engineering teams need traceable, defensible data that can support decisions on load rating, maintenance prioritization, retrofit timing, and post-event assessment. The scale is not small; U.S. bridge inventory is measured in the hundreds of thousands.

A useful reference point: U.S. bridge condition summaries from the National Bridge Inventory (NBI) indicate tens of thousands of bridges in poor condition (often described as “structurally deficient”), which puts pressure on agencies and their contractors to improve how structural decisions are justified.


Why focus on the U.S.? Three practical realities shape SHM decisions

  1. Scale of inventory and condition pressure: The U.S. bridge inventory is immense, and public reporting keeps the condition visible.
  2. Compliance and defensibility culture: Inspection and reporting frameworks such as NBIS shape how decisions are justified and documented.
  3. Funding + programs pushing modernization: Industry tracking (e.g., ARTBA’s bridge reporting tied to NBI data) highlights how federal/state programs are pushing repairs and better asset strategies; SHM fits where it can reduce uncertainty and prioritize interventions.

The bottom line: in the U.S., SHM is increasingly evaluated on whether it produces auditable data that changes decisions, not just interesting plots.

Hoan Bridge (Milwaukee, WI – December 13, 2000): A span of this bridge buckled suddenly in winter when two of the three main girders holding up a section of the bridge snapped due to brittle steel fatigue.

What Modern SHM really needs from the measurement side

A modern SHM system is not a box of sensors plus a logger. It’s a reliable measurement system that must remain trustworthy while continuously monitoring assets for extended periods (at least 10+ years), regardless of whether staff changes, models evolve, and major events occur.

A Typical U.S. SHM deployment combines:

  • Strain (foil strain gauges, vibrating wire, bridge/quarter-bridge)
  • Acceleration / vibration (IEPE accelerometers, MEMS where appropriate)
  • Displacement / tilt / crack (LVDT, string pots, inclinometers, crack meters)
  • Temperature + environment (RTD/thermocouple, humidity, wind, water level, etc.)

To stay valuable over the years, these signals must be:

  1. Accurate and stable across temperature cycles and field conditions
  2. Time-aligned across the entire structure (and across distributed locations)
  3. Logged with metadata so data is reusable for future load rating, model updates, and audits

If any one of these collapses, drifting zeros, mixed clocks, or undocumented scaling, confidence in the entire SHM program erodes.


The hidden killer in SHM: time alignment

Many SHM systems “fail quietly,” not because sensors die, but because clocks drift.
If strain, displacement, and acceleration are sampled at different time scales, the errors appear exactly where U.S. teams need the data most: when correlating events and extracting dynamics. Mode shapes smear, cause-and-effect blurs, and the output becomes hard to defend.

That’s why synchronization has become a core requirement in distributed monitoring systems: PTP (IEEE 1588) and GPS-referenced time are widely used to keep distributed nodes aligned, often achieving sub-microsecond timing accuracy in suitable architectures.

For U.S. infrastructure workflows, this matters because teams increasingly tie measurements to:

  • controlled truck passages / WIM events
  • wind gust and vibration response
  • seismic triggers
  • post-impact inspections (ship strike, vehicle impact)
  • “before/after” baselines around maintenance

Without reliable timestamps and time alignment, you lose the ability to prove correlation.


A modern SHM architecture pattern

The strongest pattern we see in 2026 is distributed measurement:

  • Place measurement modules close to sensors (short analog runs, less noise pickup)
  • Synchronize the distributed nodes to a common time base
  • Log locally for resilience, then publish upstream as needed

This is where modular DAQ platforms, such as Gantner Instruments’ Q.series X, naturally align with SHM requirements. In practice, the idea is:

  • Q.series X I/O near the structure for stable, high-resolution sensor acquisition
  • Q.series X controller / edge device for logging + health status + event handling
  • GI.bench or GI.cloud as the engineering environment for configuration, visualization, and operational dashboards
  • Open paths to downstream analysis (FE models, Python/MATLAB tooling, cloud pipelines) through standard integration options

The goal is simple: keep the physics clean at the edge, keep the timestamps defensible, and make the data usable for multiple stakeholders.


Long-term stability is not optional

In U.S. bridge and tunnel monitoring, the hard part isn’t collecting data for a month; it’s keeping data trustworthy for years through:

  • power dips, outages, and restarts
  • lightning / surge exposure and grounding realities
  • condensation, corrosion, cabinet temperature swings
  • sensor drift and recalibration cycles
  • communications interruptions (cellular dead spots, tunnel networks, remote sites)

Field programs also face lifecycle reality: the system you install today will outlive the original project team. That’s why modular systems that preserve configuration and support module replacement without “reinventing the system” tend to win in the long term.

A useful frame from the U.S. Federal Highway Administration’s research perspective is that long-term monitoring is motivated by the reality that a significant share of U.S. bridges have exceeded nominal design-life assumptions.


From measurements to models and digital twins

U.S. owners and engineering consultants increasingly want SHM to feed decisions, not just dashboards. That typically means:

  • trending for creep, thermal behavior, settlement, and degradation
  • event capture for storms/seismic/overloads
  • dynamic response and modal parameters for stiffness change detection
  • model updating and comparison against FE expectations

The enabling factor is a clean, synchronized, well-documented measurement pipeline that downstream tools can trust.

This is where open connectivity matters: when measurement systems expose data through standard enterprise and industrial patterns, it becomes realistic to connect field data to:

  • load rating workflows
  • FE model updating / calibration
  • asset management databases
  • cloud analytics (where appropriate)

Choosing the best technology that can grow with the structure

At the start of an SHM program, the best questions to ask are:

  • How do we guarantee synchronization and traceability for at least 10 years?
  • How will future teams interpret today’s scaling and metadata?
  • How do we add sensors later without replacing the system?
  • How do we handle events, outages, and maintenance without data loss?

If SHM is treated as critical measurement infrastructure, modular, distributed DAQ platforms, paired with an engineering environment such as GI.bench or GI.cloud,provide owners and consultants a realistic path to long-term, defensible monitoring.


If you’re planning a U.S. SHM program for bridges, tunnels, dams, or industrial structures, Gantner Instruments can help you determine a scalable SHM system architecture that is both accurate and reliable for the long haul.

More articles

News

Test of Battery and Battery Management Systems

At a very early stage Gantner Instruments was involved with special products for testing of batteries in the E-Drive environment. An already existing and successful product range is now supplemented with a useful novelty.

Read more...
Success Stories

Monitoring Porto’s New 400-Meter Metro Bridge

Porto is expanding its metro network, and a key challenge was building a new Douro River crossing that enhances mobility without disrupting the city’s iconic bridge landscape. The result is Ponte Ferreirinha, a slender concrete frame bridge carrying metro trains, cyclists, and pedestrians, blending seamlessly into a dense urban environment.

Read more...
Tips & Trends

Systèmes d’acquisition de données portables et mobiles

De nombreuses raisons justifient un système de mesure flexible et robuste qui doit être facile à transporter pour collecter des données de mesure à différents endroits. Il peut s'agir, par exemple, de mesures à court terme sur des machines ou des composants d'usine lors de la mise en service après un entretien, ou de mesures récurrentes sur des ponts ou d'autres ouvrages d'art.

Read more...
News

Enhanced Functionality with GI.bench’s Newest Release: Revamped UI, Powerful Tools and More!

Introducing the latest update to our powerful and intuitive testing and measurement software - GI.bench. This update promises to elevate your testing capabilities with features designed to streamline your workflow and maximize productivity.

Read more...