Overview
The new trains in Singapore are part of Land Transport Authorithy`s efforts to enhance existing rail capacity for the coming years. Out of the 42 trains, 18 trains are aimed at the North East Line (NEL) of the network while the Circle Line (CCL) will receive the 24 trains. This will improve fleet capacity by 60-70% on both lines.
The Gantner Solution
Once train cars shipped to Singapore they carrry out testing before they put them in to operation.
Test Measurement and Control system from Gantner Instruments equipped with multi-channel analog input modules and Dynamic High Voltage input modules with high isolations for Train testing for the complete driverless metro system designed and constructed by Alstom which are operating on NEL (North East Line) and CCL (Circle Line) Railway lines. The Alstom Metropolis C830 are the second generation of communication-based train control (CBTC) rolling stock currently using in Mass Rapid Transit (MRT) lines to meet the growing demand of passengers in Singapore.
NEL (North East Line) project
1 x Q.brixx station
1 x Q.brixx A101
2 x Q.brixx A107
2 x Q.brixx A128
CCL (Circle Line) project
1 x Q.brixx station
1 x Q.brixx A107
1 x Q.brixx A128
Q.brixx station
The powerful Q.brixx station is a programable test controller with logger functions.
Q.brixx A101
The Q.brixx module A101 with two universal inputs was selected for vibration measurement to provide fast high accuracy digitalization.
Q.brixx A107
The high density Q.brixx module A107 was selected to provide precise, isolated, noise free strain gage measurements.
Q.brixx A128
The Q.brixx module A128 with 4 galvanically isolated input channels was selected for high voltage testing.
More information about our products can be found in the product finder:
More articles
GI-Team in Berlin
This year we decided to celebrate our annual summer party in Germany and traveled with almost all employees to Berlin on June 25. After a cozy evening at "Lembke's Spezialitäten Brauerei" we went sightseeing in Germany's capital on Sunday.
Read more...Transform data into insights
A monumental challenge for engineers is not just how to acquire data in testing, but how to store and preserve such large volumes of it
Read more...Measure the evolution of battery technology
New ground-breaking products and powerful solutions for fast and accurate Cell, Module and Pack testing
Read more...Global Industrie Paris 2024
Join Gantner Instruments from March 25th to 28th, 2024, at Global Industrie in Paris, France.
Read more...